V Type Ball Jacket Industrial Valve
Product Introduction
Insulation Jacket Ball Valve has the characteristics of keeping warm or keeping cold. It is widely used in petroleum, chemical, metallurgical, pharmaceutical, food and other industries. The valve is used to transport the mudiem which will be solidify at room temperature.
Working Principle
The insulation jacket is covering on the outside of the valve, and the heating outside will keep the valve heat all the time. So it could work even when the temperature drops below zero. It is the best choise for heavy oil pipelines. And according to the requirement, the jacket is filling with steam, heat transfer oil, cooling water, air conditioning, etc. To make the entire valve temperature to the desired temperature and prevent the medium from crystallizing.
Technical Parameters
DN |
15-300 |
PN |
16-64 |
Size |
1"-12" |
ANSI |
150-900LB |
L |
75-900 |
H |
30-520 |
Wt |
14-300 |
Working Temperature |
-100~560 ºC |
Medium |
Heavy oil or rubber which is easy to solidify |
Base Material
Body |
SS304 |
Jecket |
A105 |
Stem |
A247-410 |
Disc |
A216-WCB |
Sealing |
PTFE |
Packing |
Flexible graphite |
Operated |
Manual, Electric actuator ,Pneumatic actuator |
Feature
1. The jecket is welded with carbon steel pipe, it will be more strong and durable.
2. It can keep heat and cold evenly
3. The connection of jacket has two types: flange or thread. And the size and connection could be customize.
Details Pictures
More Products
Control Valve |
Pneumatic Control Valve |
Electric Control Valve |
Manual Control Valve |
Self Operated Control Valve |
Ball Valve |
Pneumatic Ball Valve |
Electric Ball Valve |
Manual Ball Valve |
Butterfly Valve |
Pneumatic Butterfly Valve |
Electric Butterfly Valve |
Manual Butterfly Valve |
Other Valves |
Globe Valve |
Gate Valve |
Check Valve |
Reducing Valve |
Plug Valve |
Safety Valve |
Company development
FAQ:
1. Are you trading company or factory?
We are factory in Yongjia, Wenzhou, China.
2. Are the prodcuts certified?
Yes, ISO, FDA, SIL 2, CE, LFGB and so on.
3. Delivery time?
7-15 working days usually, but it will be longer when peak season.
4. Warrandty time?
One year for all the products.
5. MOQ?
One set.